Welcome to CNUS Appbeplay 主页 | 中文版
Home>News Content
No. 158 Binzhou Electronic Information Industrial Park Project
I. Project name
Binzhou Electronic
II. Brief introduction of project unit
State-owned Asset Investment Co., Ltd of Shandong Yangxin Economic Development Area, established in 2006, has registered capital of RMB 80 million, and mainly makes budget audit, investment, management, development and operation of infrastructure facilities projects in the development area.
III. Project contents and construction capacity
IV. Project construction conditions
At present, project construction area has complete water, power and communication facilities and flat fields. #1-7 standard factory buildings with total investment of RMB 56 million are built, comprehensive service center that uses investment of RMB 48 million by BOT mode is completed, and 3 electronic enterprises, i.e., Tianjin Zhonghuan, Trui Electronic and Jinxin Chenqi, stay in the park.
V. Total project investment
USD 100 million
VI. Analysis and prediction of market and economic benefits
After the project is put into production completely, it can realize annual new sales income of RMB 10 billion and profit of RMB 2.6 billion.
VII. Cooperation form
Joint venture, cooperative operation.
VIII. Contact information
Address: No. 1251,
Contact: Li Fushui / Liu Xinxiang
Postcode: 251800
Telephone: +86-543-8260011
Email: yxkfq2007@163.com
No. 159 Jinan High Grade Integrated Circuit Encapsulation Test Industrial Base Project
I. Project name
II. Brief introduction of project unit
Shandong Huaxing Semiconductor Company is high-tech enterprise under Inspur, has registered capital of RMB 300 million, and is leading design, research, development and encapsulation test enterprise of memory and relevant chip in
III. Project contents and construction capacity
The investor and Shandong Huaxing Semiconductor Company cooperate to build design, research, development, production and manufacture base of 1 billon piece/year middle and high grade chip in construction land of 325 mu, which is reserved for Shandong Huaxing by Jinan Comprehensive Bonded Area. The first stage is planning to build high grade integrated circuit encapsulation test factory building and auxiliary building of total
IV. Project construction conditions
The project is located in Suncun Area, and has prefect infrastructure facilities, and the first stage of base is put into operation.
V. Total project investment
To be determined
VI. Analysis and prediction of market and economic benefits
After project reaches its design capacity, it can realize annual sales income of RMB 3 billion.
VII. Cooperation form
Joint venture, cooperative operation, technical importing, public listing financing.
VIII. Contact information
Address: Room 305, Section D, Long’ao Building, No. 1,
Contact: Xing Guangjun
Postcode: 250099
Telephone: +86-531-86133325
Email: zswwzb@163.com
No. 160 Linyi Electronic Technical Industrial Park Project
I. Project name
Linyi Electronic
II. Brief introduction of project unit
Bafang Industrial Investment (
III. Project contents and construction capacity
The industrial park has planning area of 5,000 mu, needs total investment of RMB 15 million, and finishes construction within 5-8 years, wherein the first stage of project has floor area of 1,000 mu.
IV. Project construction conditions
The project passes primary evaluation by Linshu County Investment Promotion Evaluation Office and evaluation by Linshu County Evaluation Committee, finishes project site selection, reaches supplies of various auxiliaries such as water, power, gas and road, has funds, and has construction conditions.
V. Total project investment
USD 2.4615 billion
VI. Analysis and prediction of market and economic benefits
After the project is put into production completely, it can realize annual output value of RMB 80 billion, profit and tax of RMB 8 billion.
VII. Cooperation form
Joint venture, cooperative operation.
VIII. Contact information
Address: Crossing Between
Contact:
Postcode: 276700
Telephone: +86-539-6412777
Email: lsbhkfq@163.com
No. 161 Qingdao LED TV, 3D TV and Intellectual TV Research, Development and Manufacture Base Project
I. Project name
II. Brief introduction of project unit
Pingdu Economic Development Area is provincial development area approved by Shandong Provincial People’s Government in December of 1992, and is located in the east of urban area of
III. Project contents and construction capacity
The project relies on construction conditions of Pingdu Economic Development Area, and forms LED TV, 3D TV and Intellectual TV Research, Development and Manufacture Base.
IV. Project construction conditions
Since its establishment, Pingdu Economic Development Area finishes infrastructure facilities of planning area by high standards, and the whole area realizes “Nine Supplies and One Leveling”. At present, six pillar industries are formed, i.e., electronic appliance, packing and printing, textile and clothes, new building material and machine manufacture.
V. Total project investment
USD 50 million
VI. Analysis and prediction of market and economic benefits
It can realize output value of RMB 500 million, profit and tax of RMB 50 million by prediction.
VII. Cooperation form
Solely foreign funded.
VIII. Contact information
Address: Room 520,
Contact: Sun Sheng / Ma Kun
Postcode: 266700
Telephone: +86-532-88397812
Email: makun_2003@163.com
No. 162 Yantai Pioneering Software Park Project
I. Project name
Yantai Pioneering
II. Brief introduction of project unit
Zhichu Street Office has total area of
III. Project contents and construction capacity
Yantai Pioneering Software Park project has planning area of 53 mu, newly builds 8 technical buildings, has total building area of
IV. Project construction conditions
The project selects site, existing land of 53 mu is industrial land, project establishment, environmental evaluation, planning and construction license are under handling, and dewatering treatment is now made.
V. Total project investment
USD 80 million
VI. Analysis and prediction of market and economic benefits
After the project is finished, it can realize annual sales income of RMB 300 million and profit of RMB 100 million.
VII. Cooperation form
Cooperative operation.
VIII. Contact information
Address: No. 76,
Contact: Meng Jian / Zhao Ze
Postcode: 264000
Telephone: +86-535-6209008
Email: zsk6223273@163.com
No. 163 Zaozhuang Tai’erzhuang Software and Service Outsourcing Industrial Park Data Service Base Project
I. Project name
Zaozhuang Tai’erzhuang Software and
II. Brief introduction of project unit
Tai’erzhuang Software and Service Outsourcing Industrial Park, established in 2011, uses data service such as data collection, processing and analysis as major industry, mainly provides business flow service outsourcing of various fields such as finance and insurance, governmental authority, medical care and health and manufacture industry, and is planning to develop knowledge flow service outsourcing with high technical content and large added value such as product technical research, development, industrial design, cartoon and online game design, research and development and engineering design.
III. Project contents and construction capacity
Tai’erzhuang Software and Service Outsourcing Industrial Park Data Service Base has floor area of 50 mu. The project is planning to introduce data service type projects or data service enterprises to stay in the park.
IV. Project construction conditions
The project owns existing land of 1,000 mu, is close to national
V. Total project investment
USD 80 million
VI. Analysis and prediction of market and economic benefits
After the project is put into production, sales income and profit are calculated according to actual situations.
VII. Cooperation form
Solely foreign funded.
VIII. Contact information
Address: Tai’erzhuang District Commercial Bureau,
Contact: Zhang Xiaofei
Postcode: 277400
Telephone: +86-632-6626888
Email: tezzsj@163.com